Every week, on site

The construction team photographs the building every week. 44 visits since Jan 5, 2026, newest first; tap a photo to see it large.

October 20263 visits
  1. Oct 19, 2026

    Closets and wood doors go in, the elevator rails are set, the rooftop takes shape

    1 / 6Oct 19, 2026 - Closets and wood doors go in, the elevator rails are set, the rooftop takes shape

    Oct 19, 2026 - Closets and wood doors go in, the elevator rails are set, the rooftop takes shape
  2. Oct 12, 2026

    Kitchen cabinets go in, work continues on the rooftop

    1 / 6Oct 12, 2026 - Kitchen cabinets go in, work continues on the rooftop

    Oct 12, 2026 - Kitchen cabinets go in, work continues on the rooftop
  3. Oct 5, 2026

    Joint compound on the drywall, the rooftop structures go up

    1 / 6Oct 5, 2026 - Joint compound on the drywall, the rooftop structures go up

    Oct 5, 2026 - Joint compound on the drywall, the rooftop structures go up
September 20264 visits
  1. Sep 28, 2026

    Drywall taped in the units, the rooftop pool takes shape

    1 / 6Sep 28, 2026 - Drywall taped in the units, the rooftop pool takes shape

    Sep 28, 2026 - Drywall taped in the units, the rooftop pool takes shape
  2. Sep 21, 2026

    Corridor floor pour and drywall

    1 / 6Sep 21, 2026 - Corridor floor pour and drywall

    Sep 21, 2026 - Corridor floor pour and drywall
  3. Sep 14, 2026

    Windows and sliding doors installed

    1 / 6Sep 14, 2026 - Windows and sliding doors installed

    Sep 14, 2026 - Windows and sliding doors installed
  4. Sep 7, 2026

    Drywall and ceiling installations

    1 / 6Sep 7, 2026 - Drywall and ceiling installations

    Sep 7, 2026 - Drywall and ceiling installations
August 20265 visits
  1. Aug 31, 2026

    Drywall partitions going up

    1 / 6Aug 31, 2026 - Drywall partitions going up

    Aug 31, 2026 - Drywall partitions going up
  2. Aug 24, 2026

    Bathroom vanities and closet framing

    1 / 6Aug 24, 2026 - Bathroom vanities and closet framing

    Aug 24, 2026 - Bathroom vanities and closet framing
  3. Aug 17, 2026

    The banner on the facade, tiled floors inside

    1 / 6Aug 17, 2026 - The banner on the facade, tiled floors inside

    Aug 17, 2026 - The banner on the facade, tiled floors inside
  4. Aug 10, 2026

    Rooftop works, electrical panels and floor tile

    1 / 6Aug 10, 2026 - Rooftop works, electrical panels and floor tile

    Aug 10, 2026 - Rooftop works, electrical panels and floor tile
  5. Aug 4, 2026

    Facade painting from the ropes

    1 / 6Aug 4, 2026 - Facade painting from the ropes

    Aug 4, 2026 - Facade painting from the ropes
July 20264 visits
  1. Jul 28, 2026

    The rooftop pool from above, walls in plaster

    1 / 6Jul 28, 2026 - The rooftop pool from above, walls in plaster

    Jul 28, 2026 - The rooftop pool from above, walls in plaster
  2. Jul 21, 2026

    Facade glazing and rooftop walls

    1 / 6Jul 21, 2026 - Facade glazing and rooftop walls

    Jul 21, 2026 - Facade glazing and rooftop walls
  3. Jul 14, 2026

    Rooftop block walls, floors being prepared

    1 / 6Jul 14, 2026 - Rooftop block walls, floors being prepared

    Jul 14, 2026 - Rooftop block walls, floors being prepared
  4. Jul 7, 2026

    Terraces and the view from the upper floors

    1 / 6Jul 7, 2026 - Terraces and the view from the upper floors

    Jul 7, 2026 - Terraces and the view from the upper floors
June 20265 visits
  1. Jun 30, 2026

    Electrical boxes and wiring in the units

    1 / 6Jun 30, 2026 - Electrical boxes and wiring in the units

    Jun 30, 2026 - Electrical boxes and wiring in the units
  2. Jun 23, 2026

    First sliding door installed

    1 / 6Jun 23, 2026 - First sliding door installed

    Jun 23, 2026 - First sliding door installed
  3. Jun 16, 2026

    Terrace walls and ceiling installations

    1 / 6Jun 16, 2026 - Terrace walls and ceiling installations

    Jun 16, 2026 - Terrace walls and ceiling installations
  4. Jun 9, 2026

    Floors and walls prepared inside

    1 / 6Jun 9, 2026 - Floors and walls prepared inside

    Jun 9, 2026 - Floors and walls prepared inside
  5. Jun 2, 2026

    Pool shell walls, poured into the night

    1 / 6Jun 2, 2026 - Pool shell walls, poured into the night

    Jun 2, 2026 - Pool shell walls, poured into the night
May 20264 visits
  1. May 28, 2026

    Rooftop pool pour

    1 / 6May 28, 2026 - Rooftop pool pour

    May 28, 2026 - Rooftop pool pour
  2. May 26, 2026

    From the air, conduits on the floors

    1 / 6May 26, 2026 - From the air, conduits on the floors

    May 26, 2026 - From the air, conduits on the floors
  3. May 19, 2026

    Interior walls and ceilings in progress

    1 / 6May 19, 2026 - Interior walls and ceilings in progress

    May 19, 2026 - Interior walls and ceilings in progress
  4. May 12, 2026

    Rebar for the rooftop pool, interior finishes

    1 / 6May 12, 2026 - Rebar for the rooftop pool, interior finishes

    May 12, 2026 - Rebar for the rooftop pool, interior finishes
April 20264 visits
  1. Apr 28, 2026

    Ground works for services, plumbing risers inside

    1 / 6Apr 28, 2026 - Ground works for services, plumbing risers inside

    Apr 28, 2026 - Ground works for services, plumbing risers inside
  2. Apr 20, 2026

    Facade scaffolding and rooftop works

    1 / 6Apr 20, 2026 - Facade scaffolding and rooftop works

    Apr 20, 2026 - Facade scaffolding and rooftop works
  3. Apr 14, 2026

    Roof pour, kitchens being fitted

    1 / 6Apr 14, 2026 - Roof pour, kitchens being fitted

    Apr 14, 2026 - Roof pour, kitchens being fitted
  4. Apr 6, 2026

    Kitchen cabinets in, electrical fittings

    1 / 6Apr 6, 2026 - Kitchen cabinets in, electrical fittings

    Apr 6, 2026 - Kitchen cabinets in, electrical fittings
March 20265 visits
  1. Mar 30, 2026

    Rooftop structures, interiors in finishes

    1 / 6Mar 30, 2026 - Rooftop structures, interiors in finishes

    Mar 30, 2026 - Rooftop structures, interiors in finishes
  2. Mar 24, 2026

    Street front glazed, rooftop walls in formwork

    1 / 6Mar 24, 2026 - Street front glazed, rooftop walls in formwork

    Mar 24, 2026 - Street front glazed, rooftop walls in formwork
  3. Mar 17, 2026

    Rooftop parapets take shape

    1 / 6Mar 17, 2026 - Rooftop parapets take shape

    Mar 17, 2026 - Rooftop parapets take shape
  4. Mar 9, 2026

    Rooftop slab pour with the pump

    1 / 6Mar 9, 2026 - Rooftop slab pour with the pump

    Mar 9, 2026 - Rooftop slab pour with the pump
  5. Mar 3, 2026

    Rooftop rebar and interior plaster

    1 / 6Mar 3, 2026 - Rooftop rebar and interior plaster

    Mar 3, 2026 - Rooftop rebar and interior plaster
February 20265 visits
  1. Feb 27, 2026

    Rooftop slab pour

    1 / 6Feb 27, 2026 - Rooftop slab pour

    Feb 27, 2026 - Rooftop slab pour
  2. Feb 24, 2026

    White facade on the lower floors

    1 / 6Feb 24, 2026 - White facade on the lower floors

    Feb 24, 2026 - White facade on the lower floors
  3. Feb 17, 2026

    Roof slab cast, interiors in drywall

    1 / 6Feb 17, 2026 - Roof slab cast, interiors in drywall

    Feb 17, 2026 - Roof slab cast, interiors in drywall
  4. Feb 10, 2026

    Rebar for the roof slab, drywall ceilings inside

    1 / 6Feb 10, 2026 - Rebar for the roof slab, drywall ceilings inside

    Feb 10, 2026 - Rebar for the roof slab, drywall ceilings inside
  5. Feb 3, 2026

    Facade finishes begin

    1 / 6Feb 3, 2026 - Facade finishes begin

    Feb 3, 2026 - Facade finishes begin
January 20265 visits
  1. Jan 27, 2026

    Wall formwork on the roof, interiors in plaster

    1 / 6Jan 27, 2026 - Wall formwork on the roof, interiors in plaster

    Jan 27, 2026 - Wall formwork on the roof, interiors in plaster
  2. Jan 20, 2026

    Walls rising on the roof level

    1 / 6Jan 20, 2026 - Walls rising on the roof level

    Jan 20, 2026 - Walls rising on the roof level
  3. Jan 13, 2026

    Slab rebar on the top level, first plaster inside

    1 / 6Jan 13, 2026 - Slab rebar on the top level, first plaster inside

    Jan 13, 2026 - Slab rebar on the top level, first plaster inside
  4. Jan 10, 2026

    Columns and formwork for the top levels

    1 / 6Jan 10, 2026 - Columns and formwork for the top levels

    Jan 10, 2026 - Columns and formwork for the top levels
  5. Jan 5, 2026

    The frame reaches the upper floors

    1 / 6Jan 5, 2026 - The frame reaches the upper floors

    Jan 5, 2026 - The frame reaches the upper floors

A selection of 264 photographs from the developer's weekly site visits. Dates are the day of the visit.

Come and see it

The sales office is at the building, Av. Las Americas 433. Write, call, or book a visit to the model unit.

Your agent

Boardwalk Realty

By sending you accept our privacy notice. No newsletters; an agent writes to you personally.

WhatsApp